![]() |
|
![]() |
|||
|
See a Well Drilled |
|||
|
Click on the arrows below to walk through the process of drilling a well. |
|||
| Drilling (5 of 9) | |||
![]() |
|||
| Our special tri-cone drilling bit
drills into and grinds up the ground formations in much the same way a
hand drill goes through wood. The drilling mud we use is forced down into
the well during drilling which forces the ground cutting to the surface.
This allows us to look at the formations so that we can find a water
bearing formation. Oftentimes, the presence of sand, gravel or a
combination of the two alert us of a good water formation. Once a good
formation is found we move to the next phase of drilling.
|
|||
| Call for a Bid | |||
| Formulate Estimate | |||
| Stake Well Location | |||
| Setup and Initial Drilling | |||
| Drilling | |||
| Setting Casing and Developing Well | |||
| Installing Water Line | |||
| Backfilling and Cleanup | |||
| Testing the Water | |||