Click on the arrows below to walk through the process of drilling a well. |
|||
| Setup and Initial Drilling (4 of 9) | |||
![]() |
|||
| After homeowner or contractor
gives us the okay to move on the job, our drilling team moves onto the
site and sets up the equipment. Set up takes time as proper placement is
found, drill rods and bits are readied and drilling mud and rotary rig are
prepared and set for drilling. Once this is completed, the head driller
will operate the machine and begin drilling. The "helper" assists the
driller with rods and supplies as well as examines the emerging ground
formations.
|
|||
| Call for a Bid | |||
| Formulate Estimate | |||
| Stake Well Location | |||
| Setup and Initial Drilling | |||
| Drilling | |||
| Setting Casing and Developing Well | |||
| Installing Water Line | |||
| Backfilling and Cleanup | |||
| Testing the Water | |||